Lewandowski Home in Wayne, ME

The Lewandowski home is just beginning in Wayne, ME.  We should be digging for the foundation on 6-8-10. Keep checking back for updated pics!
Drive way entrance all cut.
Drive way entrance all cut.
This is how the lot looks just before the excavator shows up to clear the wood, stumps, and brush.
This is how the lot looks just before the excavator shows up to clear the wood, stumps, and brush.
North East side of the cleared lot.
North East side of the cleared lot.
Clearing the brush and lugging the wood out to be hauled off.
Clearing the brush and lugging the wood out to be hauled off.
Piling the wood harvested from the lot.
Piling the wood harvested from the lot.
All the brush and debris are piled up. Finish lugging the wood and bury the debris.
All the brush and debris are piled up. Finish lugging the wood and bury the debris.
The harvested wood has been piled up and the drive way is roughed in.
The harvested wood has been piled up and the drive way is roughed in.
Day 4 of the build, the daylight is framed along with the stairs and the deck is framed and sheathed.
Day 4 of the build, the daylight is framed along with the stairs and the deck is framed and sheathed.
Day 4 of the build. View from the driveway approach.
Day 4 of the build. View from the driveway approach.
Day 6 of the build. A 75' wall framed, sheathed and wrapped along with the 49' wall in front.
Day 6 of the build. A 75' wall framed, sheathed and wrapped along with the 49' wall in front.
Day 6 of the build. View from the driveway approach. All walls of the house are framed.
Day 6 of the build. View from the driveway approach. All walls of the house are framed.
Finished home, mid-winter.
Finished home, mid-winter.
  • Drive way entrance all cut.
  • This is how the lot looks just before the excavator shows up to clear the wood, stumps, and brush.
  • North East side of the cleared lot.
  • Clearing the brush and lugging the wood out to be hauled off.
  • Piling the wood harvested from the lot.
  • All the brush and debris are piled up. Finish lugging the wood and bury the debris.
  • The harvested wood has been piled up and the drive way is roughed in.
  • Day 4 of the build, the daylight is framed along with the stairs and the deck is framed and sheathed.
  • Day 4 of the build. View from the driveway approach.
  • Day 6 of the build. A 75' wall framed, sheathed and wrapped along with the 49' wall in front.
  • Day 6 of the build. View from the driveway approach. All walls of the house are framed.
  • Finished home, mid-winter.

Categories

  • New Homes / Additions / Decks
  • Remodeling / Finishwork
  • Furniture / Cabinetry